Show simple item record

dc.contributor.authorRahman, Saifur
dc.contributor.authorAhmed, Mst. Afsana
dc.contributor.authorAli, Md. Bakul
dc.contributor.authorPiash, Rabi-Us-Sany
dc.contributor.authorBhuyan, Humayun Kobir
dc.date.accessioned2025-01-11T06:17:26Z
dc.date.available2025-01-11T06:17:26Z
dc.date.issued2021-08-22
dc.identifier.urihttp://suspace.su.edu.bd/handle/123456789/1025
dc.description.abstractThe transport sector of Dhaka city is categorized by terrible, congestion and delays, insufficient traffic management, poor organization among agencies, and also lack of integration between different transportation modes. It is perhaps the only city in the world of this size without having a well-organized and scheduled mass transit system. Implementing and improving circular water transport can facilitate the Government of Bangladesh to achieve this goal. The main objective of this study is to investigate the existing situation of the Ghats and riverbank conditions of the circular waterway transportation of Gabtoli to Babubazar; analyze the problems and expectations of the waterway and recommend necessary measures to enable circular river transport to play a greater role in the transportation system of Dhaka city. From the study on water transport from Gabtoli to Babubazar, it was understood that in the near future waterbus can travel periodically with a number of prospective passengers. An efficient water transport system should provide proper and effective linkage to the existing transport system. All the possible road transport options should be available at the landing stations from bus service to subway. A possible linkage should be provided between the landing stations and nearby public transport facilities. Para-transport facilities should also be provided to connect the water-bus users to the nearest public transport facilities. To ensure swift, safe and unhindered turning of waterbus, modern landing facilities should be provided. There should be the availability of adequate information on the various routes, fares, and timing of the waterway services. After analysis prospective routes of water buses from Gabtoli to Babubazar have been proposed based on demand and respondents’ responses.en_US
dc.language.isoen_USen_US
dc.publisherSoanargaon Universiy (SU)en_US
dc.relation.ispartofseries;BCE- 210678
dc.subjectViability Of Water Transport : Analysis In The Context Of Dhaka (Gabtoli-Babubazar).en_US
dc.titleViability Of Water Transport : Analysis In The Context Of Dhaka (Gabtoli-Babubazar).en_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record