A case study on Idle time identification and reducing idle time through work study and line balancing to increase the productivity in sewing section of knit garments.
View/ Open
Date
2021-10-05Author
Paul, Suman Chandra
Arafat, Md.Easir
Nibir, Kamruzzaman
Rahman, Md. Siddkur
Metadata
Show full item recordAbstract
Bangladesh's export revenue carries more than 76% contribution from the Textile and Apparel
industries. In sewing floor there are several problems which hamper the productivity and
efficiency and thus we do not get desired output. This paper, we discussed about the idle time
which occurs in sewing line, how these idle times can be reduced by proper line balancing and
time study. If idle time can be reduced then the productivity and efficiency of the sewing line can
also be increased. Line balancing and time study are important stage in any garment industries. In
this paper, we are comparing the productivity and efficiency of three different style sewing line.
From the evaluation of the reports, we are trying to minimize the idle time of a line. The
objective of this study is to learn about the idle time minimization and how much the productivity
and efficiency are affected by means of suitable use of time study, method study, capacity find
out about and via appropriate line balancing. If we capable to reduce the idle time it will help to
optimize the productivity, efficiency and man, machine, material will be properly used.
Collections
- 2021-2025 [55]