• Login
    View Item 
    •   SUSpace Home
    • Faculty of Science and Engineering
    • Department of Textile Engineering
    • 2021-2025
    • View Item
    •   SUSpace Home
    • Faculty of Science and Engineering
    • Department of Textile Engineering
    • 2021-2025
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Report On Industrial Attachment with B.Brothers Garments CO.Unite-2 LTD.90.Barpa,Rupshi,Rupgonj,Narayangonj.

    Thumbnail
    View/Open
    Group-B WP (Kamrul Sir- I.A)- 6.pdf (1.848Mb)
    Date
    2021-09-30
    Author
    Islam, Md.Sahidul
    Rahman, Md.Motiur
    Arafat, Md.Eyasin
    Miah, Saykat
    Hossen, Md.Ujjal
    Metadata
    Show full item record
    Abstract
    We have completed our industrial attachment successfully by the grace of Almighty Allah. Industrial attachment will give us our expected destiny of practical life .By the completion of two months of Industrial attachment at .BROTHERS GARMENTS CO.UNIT-2LTD, we have got the impression that the factory is one of the most modern export orientedknitcompositeinBangladesh.Thoughitwasestablishedonlyafewyearsago ,it has earned " very good reputations "for its best performance over many other export oriented textile mills . Mill is settled with utility to give all convenient supports to the productions for twenty- four hours.B.BROTHER L hasits own water pre-treatment plant & 26,300 cubic feet water reservoirs in its Narayangonj PDP .The Narayangonj.premises has its own power generation plant where 1,900 kw power generators guarantee smooth & uninterrupted power supply to its every operation. However there are some points to be mentioned: During the transportation of the fabric on the dyeing floor & also during the loading of the machine, fabrics are soiled by the contact with floor. This makes the fabric/part of the fabric dirty. It may require more scouring/bleaching agent or may create stain making it faulty. •The- dyeing floor is watery most of the time. It should be kept clean all the time. •Many time the dosing pipelines are clogged due to the careless doing of the chemicals. The supervisors should supervise the floor more sincerely. •The machine stoppage time should be analyzed & minimized. The maintenance should be carried out when the machine is out of action (wherever possible).
    URI
    http://suspace.su.edu.bd/handle/123456789/632
    Collections
    • 2021-2025 [55]

    Copyright © 2022-2025 Library Home | Sonargaon University
    Contact Us | Send Feedback
     

     

    Browse

    All of SUSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Copyright © 2022-2025 Library Home | Sonargaon University
    Contact Us | Send Feedback