Show simple item record

dc.contributor.authorHasan, Md. Mehedy
dc.contributor.authorAl Momin, Md. Abdullah
dc.contributor.authorRaihan, Md. Saikat
dc.contributor.authorRabby, Md. Fazlay
dc.contributor.authorKhatun, Mst. Topy
dc.date.accessioned2023-10-21T05:51:53Z
dc.date.available2023-10-21T05:51:53Z
dc.date.issued2021-10-15
dc.identifier.urihttp://suspace.su.edu.bd/handle/123456789/663
dc.description.abstractIt is proven that by the application of Lean techniques in manufacturing, business can be profited by improvement in the level of productivity and cutting down the processes that is responsible for wastages. In Bangladesh, Apparel industries face a lot of challenges and the most difficult of them is to meet the shipment date. To ensure the products have been manufactured and assembled in due time, manufacturers emphasize on choosing the best method of production process. With the help of Kaizen and 5‟s, it is possible to identify non value added processes and eliminate them from the production process. In this paper, we have taken the production data of a knitted jacket and considered the SMV data in two phases, one with the traditional line and the other one is with the implementation of Lean technique to see the differences of SMV data in different stages of production. To be competitive and meet ever increasing demand of apparel buyers to reduce cost, supply smaller quantity order at shorter lead time as well as increasing labor cost in the local market has forced the local manufacturers of Bangladesh to improve labor productivity, quality, to reduce lead time and produce small order quantity efficiently. Tools and techniques of Lean manufacturing may play an important role in their quest for meeting ever increasing demand of customers profitably. Lean manufacturing requires keeping far less than half the needed inventory on site, results in many fewer defects, and produces a greater and ever growing variety of products. Lean consists of best practices, tools and techniques from throughout industry with the aims of reducing waste and maximizing efficiency to achieve the ultimate customer satisfaction. The present study focuses on improving line efficiency, throughput time of an assembly line through identifying wastes using value stream mapping and other analyses, identifying opportunities for improvement and required tools and techniques of lean manufacturing and industrial engineering to implement. An assembly line in an apparel factory is considered to implement this study as well as line efficiency, throughput time, machine utilization, space utilization, WIP and other performance parameters are compared before and after implementing the tools and techniques of lean manufacturing and industrial engineering. Though outcomes of 5S and visual management are difficult to quantify, these tools are foundations for lean implementationen_US
dc.language.isoenen_US
dc.publisherSUen_US
dc.subjectTechnical: Manufacturing: Industry: Productionen_US
dc.titleAPPLICABILITY OF LEAN TOWARDS IMPROVED EFFICIENCY IN SAMPLE PROCESSESen_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record